DAWCO’s mandate included:Installation of a new nitrogen line connecting the plant to Esso’s property near the existing pipeline bridge Installation of a new underground oxygen line connecting the plant to Esso’s property near the existing pipeline bridge Installation of new above ground pipes and fittings connecting existing above ground pipes to the new underground pipes Installation of a new wastewater pump inside the pumping station