![featured](https://www.dawco.ca/hubfs/Station%20d%E2%80%99%C3%A9puration-1.webp)
Montreal, (Quebec, Canada)
Integrated work: Design and Build
Our electrical mandate involved distribution work (“design-build” services), installation and supply of service engines, as well as all auxiliary services.
In addition, DAWCO was awarded the mandate to build the 315kv/25kv transformer substation at the J-R. Marcotte treatment plant.
DAWCO also took care of carrying out the fabrication and installation of the building envelope for a 315/25kV electrical substation.