For over 15 years, DAWCO has conducted global shutdowns at the Pontiac division of Smurfit-Stone mill in the wood preparation, causticizing and gas handling departments, as well as evaporators, digesters, bleachers, paper machines and effluent treatment. Work includes the replacement of piping and boilers and the inspection of these mechanical elements. In addition, DAWCO has worked on modernising control and power systems at the Kruger Bromptonville mill as well as on machines 2 and 3 at Kruger Wayagamack. DAWCO was also responsible for the replacement of tubes in the evaporators for 3 consecutive shutdowns at the Fortress mill in Thurso. Our experience equally includes several installation projects for headboxes, presses, dryers, rollers, stock washers and much more.
Fives Domtar (Bridge crane)
Pulp & Paper
DAWCO has been awarded a mandate to perform electrical installation work at Fives as part of the renovation of a 60 ton overhead crane.